 Post subject: Mama Mia (Sahl Hasheesh)
PostPosted: Thu Oct 08, 2009 10:57 pm 
Offline
Moderator
User avatar

Joined: Thu Jun 18, 2009 10:04 am
Posts: 1449
Location: Oldham/Manchester
I have been shown an amazing project on Sahl Hasheesh, called Mama Mia (Italian developer), they are building with a brand new type of construction process from Italy and using top end fittings. I am waiting for more information but I think finally I have found a safe and exciting project to market, if anyone knows otherwise please let me know. I will be asking DWS to draw up sales contracts if I sell any to give me even more reassurance. Let me know if anyone wants more info when I get it.

_________________
Best, Regards, Neil Hollingsworth
Tel:0161 6525563/07717826505
Please have a look at our new website http://www.rivermeadglobalproperty.co.uk


Top
 Profile  
 
 Post subject: Re: Mama Mia (Sahl Hasheesh)
PostPosted: Fri Oct 09, 2009 3:31 pm 
Offline

Joined: Sun Jun 21, 2009 10:25 am
Posts: 12
yes i have heard that abba have 4 apartments on there


Top
 Profile  
 
 Post subject: Re: Mama Mia (Sahl Hasheesh)
PostPosted: Sat Oct 10, 2009 8:02 am 
Offline
Moderator
User avatar

Joined: Thu Jun 18, 2009 10:04 am
Posts: 1449
Location: Oldham/Manchester
davey wrote:
yes i have heard that abba have 4 apartments on there


Excellent :D :D :D

_________________
Best, Regards, Neil Hollingsworth
Tel:0161 6525563/07717826505
Please have a look at our new website http://www.rivermeadglobalproperty.co.uk


Top
 Profile  
 
 Post subject: Re: Mama Mia (Sahl Hasheesh)
PostPosted: Wed Oct 28, 2009 11:31 am 
Offline

Joined: Fri Jun 19, 2009 3:24 pm
Posts: 2
Hi Neil

Could their be possibility of swapping CSP apartment for one of these ?


Top
 Profile  
 
 Post subject: Re: Mama Mia (Sahl Hasheesh)
PostPosted: Wed Oct 28, 2009 1:13 pm 
Offline
Moderator
User avatar

Joined: Thu Jun 18, 2009 10:04 am
Posts: 1449
Location: Oldham/Manchester
Rayk wrote:
Hi Neil

Could their be possibility of swapping CSP apartment for one of these ?


Hi Ray, not sure but I will find out. It won't be for a week though as my contact over there involved with this development is away, will get back to you ASAP.

_________________
Best, Regards, Neil Hollingsworth
Tel:0161 6525563/07717826505
Please have a look at our new website http://www.rivermeadglobalproperty.co.uk


Top
 Profile  
 
 Post subject: Re: Mama Mia (Sahl Hasheesh)
PostPosted: Mon Nov 09, 2009 4:13 pm 
Offline
Moderator
User avatar

Joined: Thu Jun 18, 2009 10:04 am
Posts: 1449
Location: Oldham/Manchester
The original designs submitted to ERC have been refused due to the amount of units being planned. Due to this they are having to redesign and resubmit another plan, I have no idea how long this process will take but will post any updates as I receive them.

_________________
Best, Regards, Neil Hollingsworth
Tel:0161 6525563/07717826505
Please have a look at our new website http://www.rivermeadglobalproperty.co.uk


Top
 Profile  
 
 Post subject: Re: Mama Mia (Sahl Hasheesh)
PostPosted: Mon Jun 14, 2010 7:41 pm 
Offline
Moderator
User avatar

Joined: Thu Jun 18, 2009 10:04 am
Posts: 1449
Location: Oldham/Manchester
Eventually a brochure has arrived, it is a translation of the Italian one.


Attachment:
Mamma Mia brochure English.pdf [1.01 MiB]
Downloaded 305 times

_________________
Best, Regards, Neil Hollingsworth
Tel:0161 6525563/07717826505
Please have a look at our new website http://www.rivermeadglobalproperty.co.uk


Top
 Profile  
 
 Post subject: Re: Mama Mia (Sahl Hasheesh)
PostPosted: Wed Jun 23, 2010 2:31 pm 
Offline
Moderator
User avatar

Joined: Thu Jun 18, 2009 10:04 am
Posts: 1449
Location: Oldham/Manchester
Here are some renders, plans, brochure and layouts for the Mamma Mia complex, we are now officially launching this development and the prices will be rising in one month 22 July 2010 and again in October 2010.

At the moment they are:

1 bed from €40,000

2 bed from €50,000

There are 9 Penthouse apartments, and we have the exclusive selling rights on the remaining 5, prices to follow very soon, but will be around €130,000.

Attachment:
Palazzine 1 camera.jpg
Palazzine 1 camera.jpg [ 1.15 MiB | Viewed 5387 times ]


Attachment:
Palazzine 2 camere.jpg
Palazzine 2 camere.jpg [ 1.32 MiB | Viewed 5384 times ]


Attachment:
Mamma Mia layout 1.JPG
Mamma Mia layout 1.JPG [ 357.43 KiB | Viewed 5387 times ]


Attachment:
Layout_A3.pdf [1.43 MiB]
Downloaded 227 times


Attachment:
Mamma Mia brochure English.pdf [1.01 MiB]
Downloaded 229 times

_________________
Best, Regards, Neil Hollingsworth
Tel:0161 6525563/07717826505
Please have a look at our new website http://www.rivermeadglobalproperty.co.uk


Top
 Profile  
 
 Post subject: Re: Mama Mia (Sahl Hasheesh)
PostPosted: Wed Jul 07, 2010 9:18 am 
Offline
Moderator
User avatar

Joined: Thu Jun 18, 2009 10:04 am
Posts: 1449
Location: Oldham/Manchester
The final licences have been granted, work will be commencing in a couple of weeks and the prices are to rise by 5% on the 22nd July and by a further 7% in October.

If you are looking to buy an investment property anywhere in the world at the moment not just Egypt Mamma Mia is where you should be looking. The resort of Sahl Hasheesh is looking amazing and is still years away from being fully completed, the golf courses are moving ahead, the diving is excellent, it is gated, it has a fantastic beach open to all and the prices of Mamma Mia are around 50% lower than similar properties in the area. You are buying Sahl Hasheesh at Hurghada prices, please contact for more info.

_________________
Best, Regards, Neil Hollingsworth
Tel:0161 6525563/07717826505
Please have a look at our new website http://www.rivermeadglobalproperty.co.uk


Top
 Profile  
 
 Post subject: Re: Mama Mia (Sahl Hasheesh)
PostPosted: Wed Jul 14, 2010 10:07 am 
Offline

Joined: Tue Jul 28, 2009 3:35 pm
Posts: 33
Hi Neil - regarding the DP swaps to MM - is there anything I need to be doing for it now? Or is it is just a case of waiting for DWS to complete individual contracts and for me to be contacted by DWS once these are ready (I presume the you or the HRA will pass on my contact details to DWS on my behalf?)

Regards,
Pebble8


Top
 Profile  
 
 Post subject: Re: Mama Mia (Sahl Hasheesh)
PostPosted: Wed Jul 14, 2010 2:52 pm 
Offline
Moderator
User avatar

Joined: Thu Jun 18, 2009 10:04 am
Posts: 1449
Location: Oldham/Manchester
Pebble8 wrote:
Hi Neil - regarding the DP swaps to MM - is there anything I need to be doing for it now? Or is it is just a case of waiting for DWS to complete individual contracts and for me to be contacted by DWS once these are ready (I presume the you or the HRA will pass on my contact details to DWS on my behalf?)

Regards,
Pebble8


Hi Pebble, I also discussed this last night as well, they have been given all the paperwork by Ehab and Soha is going through it all but yes you are correct I will give the UK office your details and they will be in contact.

_________________
Best, Regards, Neil Hollingsworth
Tel:0161 6525563/07717826505
Please have a look at our new website http://www.rivermeadglobalproperty.co.uk


Top
 Profile  
 
 Post subject: Re: Mama Mia (Sahl Hasheesh)
PostPosted: Wed Jul 14, 2010 5:20 pm 
Offline

Joined: Sat Jul 25, 2009 9:52 pm
Posts: 17
Hi Neil

As Pebble, do we need to do anything regard switch to Mamma Mia. We are still (just about) renting out on DP1, when will we be able to rent to, we assume at least up until exchange of contract. What arrangements costs would we need to allow, DWS and any others? We assume that being as we paid for the electric meters etc, that these will be installed as part of the deal?

Also we noted in the brochure the MM wouldn't be ready until Jan 2013, is this correct or will the apartments be available earlier for occupancy i.e. is there a phase 1 and 2. Are we correct to assume that those transferring from DP1 will get first available occupancy date(s)

Best wishes to everyone, enjoy your new apartments with a fresh start. Hope after the efforts of Neil, DWS and the kind admin team that our nightmare is coming to an end.

Many Thanks Again Neil.

Rob


Top
 Profile  
 
 Post subject: Re: Mama Mia (Sahl Hasheesh)
PostPosted: Thu Jul 15, 2010 8:24 am 
Offline
Moderator
User avatar

Joined: Thu Jun 18, 2009 10:04 am
Posts: 1449
Location: Oldham/Manchester
rafa5002 wrote:
Hi Neil

As Pebble, do we need to do anything regard switch to Mamma Mia. We are still (just about) renting out on DP1, when will we be able to rent to, we assume at least up until exchange of contract. What arrangements costs would we need to allow, DWS and any others? We assume that being as we paid for the electric meters etc, that these will be installed as part of the deal?

Also we noted in the brochure the MM wouldn't be ready until Jan 2013, is this correct or will the apartments be available earlier for occupancy i.e. is there a phase 1 and 2. Are we correct to assume that those transferring from DP1 will get first available occupancy date(s)

Best wishes to everyone, enjoy your new apartments with a fresh start. Hope after the efforts of Neil, DWS and the kind admin team that our nightmare is coming to an end.

Many Thanks Again Neil.

Rob


Hi Rob, I don't have you down for a swap to Mamma Mia, can you let me know when this was discussed, I remember you not being sure what you wanted to do. Unfortunately I am no longer able to swap anyone to Mamma Mia due to the amount of money it was costing El Riad, they are allowing the first ones I sent but no more. Please let me know and send me the email with details of the swap, thanks.

_________________
Best, Regards, Neil Hollingsworth
Tel:0161 6525563/07717826505
Please have a look at our new website http://www.rivermeadglobalproperty.co.uk


Top
 Profile  
 
 Post subject: Re: Mama Mia (Sahl Hasheesh)
PostPosted: Thu Jul 15, 2010 10:57 pm 
Offline

Joined: Thu Jul 02, 2009 1:26 pm
Posts: 5
Hi Neil,
Sorry to bother you, but can you check if our apartment L403 is in the list for swap to Mamma Mia please?
Many thanks,
lau


Top
 Profile  
 
 Post subject: Re: Mama Mia (Sahl Hasheesh)
PostPosted: Fri Jul 16, 2010 8:28 am 
Offline
Moderator
User avatar

Joined: Thu Jun 18, 2009 10:04 am
Posts: 1449
Location: Oldham/Manchester
lau wrote:
Hi Neil,
Sorry to bother you, but can you check if our apartment L403 is in the list for swap to Mamma Mia please?
Many thanks,
lau


Hi Lau, no I only had a few emails or replies from people saying they wanted to swap to Mamma Mia, any further swaps now are to Pyramids Beach. If I have missed any messages or emails saying you wanted to swap to Mamma Mia please email them to me, thanks.

_________________
Best, Regards, Neil Hollingsworth
Tel:0161 6525563/07717826505
Please have a look at our new website http://www.rivermeadglobalproperty.co.uk


Top
 Profile  
 
 Post subject: Re: Mama Mia (Sahl Hasheesh)
PostPosted: Mon Jul 26, 2010 10:41 pm 
Offline

Joined: Thu Jul 02, 2009 1:26 pm
Posts: 5
Hi Neil,
Is there any news on our situation? Are we allowed to move to Mamma Mia? If not, do we need to pick an apartment quickly in PB?
We really don't want to be left behind in DP1!!
Thanks for your help.
Lau


Top
 Profile  
 
 Post subject: Re: Mama Mia (Sahl Hasheesh)
PostPosted: Sun Sep 19, 2010 1:47 pm 
Offline
Moderator
User avatar

Joined: Thu Jun 18, 2009 10:04 am
Posts: 1449
Location: Oldham/Manchester
I have been with the Mamma Mia developers yesterday and today and they had a final meeting in the Sahl Hasheesh ERC office, the engineers WILL be on site tomorrow to start the webwork (plotting the development on the ground) ready to start construction in around 2 weeks. This has taken a lot longer than anticipated but at last it has the green light, please see below a photo taken this afternoon of the Mamma Mia team and myself. This is great news and one I know many have been waiting for, there are still apartments available if anyone is looking for an excellent investment. Please contact us ASAP.


Attachment:
CIMG2397.JPG
CIMG2397.JPG [ 168.66 KiB | Viewed 5392 times ]

_________________
Best, Regards, Neil Hollingsworth
Tel:0161 6525563/07717826505
Please have a look at our new website http://www.rivermeadglobalproperty.co.uk


Top
 Profile  
 
 Post subject: Re: Mama Mia (Sahl Hasheesh)
PostPosted: Thu Sep 30, 2010 5:01 pm 
Offline
Moderator
User avatar

Joined: Thu Jun 18, 2009 10:04 am
Posts: 1449
Location: Oldham/Manchester
Engineers on site last week plotting out the land and next week they are planning on starting construction, as long as ERC don't put any more hurdles in the way. I have also posted a video showing how close the site is to the Old Town, beach, sea etc... It is less than a minutes drive so around 5min walk to the path that winds through the palm trees to the beach. It also carries on along the back of the Old Town, Welcome Piazza, Sunset Pearl etc...

Attachment:
PICT1171.JPG
PICT1171.JPG [ 624.76 KiB | Viewed 5382 times ]


Attachment:
PICT1168.JPG
PICT1168.JPG [ 625.66 KiB | Viewed 5382 times ]


Attachment:
PICT1166.JPG
PICT1166.JPG [ 625.84 KiB | Viewed 5383 times ]


http://www.youtube.com/watch?v=lw7TqaL1TIE again no laughing at the commentary :D

_________________
Best, Regards, Neil Hollingsworth
Tel:0161 6525563/07717826505
Please have a look at our new website http://www.rivermeadglobalproperty.co.uk


Top
 Profile  
 
 Post subject: Re: Mama Mia (Sahl Hasheesh)
PostPosted: Tue Oct 05, 2010 1:12 pm 
Offline
Moderator
User avatar

Joined: Thu Jun 18, 2009 10:04 am
Posts: 1449
Location: Oldham/Manchester
New renders for Mamma Mia, we also have some virtual tours but they are too big to email so if anyone wants to see them you will need to come and see us.

Attachment:
LAKE POOL 1 logo.jpg
LAKE POOL 1 logo.jpg [ 375.14 KiB | Viewed 5383 times ]


Attachment:
LAKE POOL 2 logo.jpg
LAKE POOL 2 logo.jpg [ 340.87 KiB | Viewed 5382 times ]


Attachment:
LAKE POOL 3 logo.jpg
LAKE POOL 3 logo.jpg [ 382.34 KiB | Viewed 5382 times ]


Attachment:
POOL MIDDLE 1 logo.jpg
POOL MIDDLE 1 logo.jpg [ 372.56 KiB | Viewed 5382 times ]


Attachment:
POOL MIDDLE 2 logo.jpg
POOL MIDDLE 2 logo.jpg [ 333.14 KiB | Viewed 5382 times ]


Attachment:
POOL SEA 1 logo.jpg
POOL SEA 1 logo.jpg [ 288.65 KiB | Viewed 5383 times ]

_________________
Best, Regards, Neil Hollingsworth
Tel:0161 6525563/07717826505
Please have a look at our new website http://www.rivermeadglobalproperty.co.uk


Top
 Profile  
 
 Post subject: Re: Mama Mia (Sahl Hasheesh)
PostPosted: Thu Oct 07, 2010 8:40 am 
Offline
Moderator
User avatar

Joined: Thu Jun 18, 2009 10:04 am
Posts: 1449
Location: Oldham/Manchester
As mentioned previously Mamma Mia is being constructed using new state of the art materials, ensuring quicker construction, better heat insulation (and keeping heat out), better sound proofing, stronger and better finishing. Please use the link below to view the website of the company that supplies this new material, there is a plant in Cairo that is supplying Mamma Mia. The developers of MM have even been approached by other builders asking if they can supply this material to finish other builds within Sahl Hasheesh.

http://www.mdue.it/en/1/home.html

_________________
Best, Regards, Neil Hollingsworth
Tel:0161 6525563/07717826505
Please have a look at our new website http://www.rivermeadglobalproperty.co.uk


Top
 Profile  
 
 Post subject: Re: Mama Mia (Sahl Hasheesh)
PostPosted: Sat Oct 09, 2010 12:02 pm 
Offline

Joined: Thu Jul 09, 2009 4:40 pm
Posts: 87
RivermeadGlobal wrote:
As mentioned previously Mamma Mia is being constructed using new state of the art materials, ensuring quicker construction, better heat insulation (and keeping heat out), better sound proofing, stronger and better finishing. Please use the link below to view the website of the company that supplies this new material, there is a plant in Cairo that is supplying Mamma Mia. The developers of MM have even been approached by other builders asking if they can supply this material to finish other builds within Sahl Hasheesh.

http://www.mdue.it/en/1/home.html




what is the conection with el riad are they doing the build on this complex


Top
 Profile  
 
 Post subject: Re: Mama Mia (Sahl Hasheesh)
PostPosted: Mon Oct 11, 2010 8:13 am 
Offline
Moderator
User avatar

Joined: Thu Jun 18, 2009 10:04 am
Posts: 1449
Location: Oldham/Manchester
jeremybright wrote:
RivermeadGlobal wrote:
As mentioned previously Mamma Mia is being constructed using new state of the art materials, ensuring quicker construction, better heat insulation (and keeping heat out), better sound proofing, stronger and better finishing. Please use the link below to view the website of the company that supplies this new material, there is a plant in Cairo that is supplying Mamma Mia. The developers of MM have even been approached by other builders asking if they can supply this material to finish other builds within Sahl Hasheesh.

http://www.mdue.it/en/1/home.html




what is the conection with el riad are they doing the build on this complex


No they had purchased the land from ERC so it is a joint venture in that they are the land owners and Enjoy Egypt/Mamma Mia are the developers and have brought in a specialised company that have built using M2 before.

_________________
Best, Regards, Neil Hollingsworth
Tel:0161 6525563/07717826505
Please have a look at our new website http://www.rivermeadglobalproperty.co.uk


Top
 Profile  
 
 Post subject: Re: Mama Mia (Sahl Hasheesh)
PostPosted: Mon Oct 11, 2010 11:24 am 
Offline

Joined: Thu Jul 09, 2009 4:40 pm
Posts: 87
RivermeadGlobal wrote:
jeremybright wrote:
RivermeadGlobal wrote:
As mentioned previously Mamma Mia is being constructed using new state of the art materials, ensuring quicker construction, better heat insulation (and keeping heat out), better sound proofing, stronger and better finishing. Please use the link below to view the website of the company that supplies this new material, there is a plant in Cairo that is supplying Mamma Mia. The developers of MM have even been approached by other builders asking if they can supply this material to finish other builds within Sahl Hasheesh.

http://www.mdue.it/en/1/home.html




what is the conection with el riad are they doing the build on this complex


No they had purchased the land from ERC so it is a joint venture in that they are the land owners and Enjoy Egypt/Mamma Mia are the developers and have brought in a specialised company that have built using M2 before.



thank you for the info i am happy they are not the builder as will have taken all there work force away from the rest of there develepments


Top
 Profile  
 
 Post subject: Re: Mama Mia (Sahl Hasheesh)
PostPosted: Mon Nov 15, 2010 4:21 pm 
Offline
Moderator
User avatar

Joined: Thu Jun 18, 2009 10:04 am
Posts: 1449
Location: Oldham/Manchester
Excavation has started :D :D :D :D

Attachment:
mamma mia november pics.JPG
mamma mia november pics.JPG [ 632.08 KiB | Viewed 7133 times ]



Attachment:
mamma mia development 2010.JPG
mamma mia development 2010.JPG [ 629.93 KiB | Viewed 7129 times ]



Attachment:
mamma mia november.JPG
mamma mia november.JPG [ 624.13 KiB | Viewed 7131 times ]

_________________
Best, Regards, Neil Hollingsworth
Tel:0161 6525563/07717826505
Please have a look at our new website http://www.rivermeadglobalproperty.co.uk


Top
 Profile  
 
 Post subject: Re: Mama Mia (Sahl Hasheesh)
PostPosted: Thu Nov 25, 2010 12:36 pm 
Offline
Moderator
User avatar

Joined: Thu Jun 18, 2009 10:04 am
Posts: 1449
Location: Oldham/Manchester
More construction photos.

Attachment:
Excavation1.jpg
Excavation1.jpg [ 116.17 KiB | Viewed 7129 times ]


Attachment:
Excavation2.jpg
Excavation2.jpg [ 147.52 KiB | Viewed 7129 times ]


Attachment:
Excavation3.jpg
Excavation3.jpg [ 166.8 KiB | Viewed 7128 times ]


Attachment:
Excavation4.jpg
Excavation4.jpg [ 164.25 KiB | Viewed 7127 times ]


Attachment:
Excavation5.jpg
Excavation5.jpg [ 179.71 KiB | Viewed 7127 times ]

_________________
Best, Regards, Neil Hollingsworth
Tel:0161 6525563/07717826505
Please have a look at our new website http://www.rivermeadglobalproperty.co.uk


Top
 Profile  
 
 Post subject: Re: Mama Mia (Sahl Hasheesh)
PostPosted: Wed Feb 16, 2011 8:53 am 
Offline

Joined: Wed Feb 16, 2011 8:35 am
Posts: 1
Why is this project taking so long to put the foundations down?


Top
 Profile  
 
 Post subject: Re: Mama Mia (Sahl Hasheesh)
PostPosted: Wed Mar 02, 2011 7:54 pm 
Offline
Moderator
User avatar

Joined: Thu Jun 18, 2009 10:04 am
Posts: 1449
Location: Oldham/Manchester
Here are some photos from the Mamma Mia site, I stood on the building on the next plot so I could look down on the site. As you can see they have now dug out all the foundations for the blocks and have now hit firm ground where they can begin the process of laying the foundations. You will see the project move on quickly now and they have brought in another 2 Italian architects as the Egyptians weren't getting it quite right, especially seeing as they are building with state of the art materials.

With me being higher up you can get an idea of how good the views will be, I stood on the third floor where you can see the wall in the photo, you will also notice there is more grass on the golf course and the plastic coverings for the lakes and water features are laid.

Attachment:
CIMG3484.jpg
CIMG3484.jpg [ 235.96 KiB | Viewed 7102 times ]



Attachment:
CIMG3485.jpg
CIMG3485.jpg [ 215.37 KiB | Viewed 7102 times ]



Attachment:
CIMG3489.jpg
CIMG3489.jpg [ 199.55 KiB | Viewed 7102 times ]



Attachment:
CIMG3491.jpg
CIMG3491.jpg [ 211.43 KiB | Viewed 7102 times ]



Attachment:
CIMG3493.jpg
CIMG3493.jpg [ 214.76 KiB | Viewed 7102 times ]

_________________
Best, Regards, Neil Hollingsworth
Tel:0161 6525563/07717826505
Please have a look at our new website http://www.rivermeadglobalproperty.co.uk


Top
 Profile  
 
 Post subject: Re: Mama Mia (Sahl Hasheesh)
PostPosted: Thu Jul 21, 2011 5:50 pm 
Offline
Moderator
User avatar

Joined: Thu Jun 18, 2009 10:04 am
Posts: 1449
Location: Oldham/Manchester
As of today the Mamma Mia plot of land (the development was never theirs) is no longer in the hands of El Riad or Yasser. This is great news and everyone with an interest in Pyramids Beach will be contacted over the coming weeks.

_________________
Best, Regards, Neil Hollingsworth
Tel:0161 6525563/07717826505
Please have a look at our new website http://www.rivermeadglobalproperty.co.uk


Top
 Profile  
 
 Post subject: Re: Mama Mia (Sahl Hasheesh)
PostPosted: Thu Jul 21, 2011 6:05 pm 
Offline

Joined: Tue Jul 28, 2009 3:35 pm
Posts: 33
Sorry Neil - can you clarify the above, does this mean I can no longer swap to MM? If so, I see this as terrible news. I don't want an apartment in PB......


Top
 Profile  
 
 Post subject: Re: Mama Mia (Sahl Hasheesh)
PostPosted: Thu Jul 21, 2011 6:41 pm 
Offline
Moderator
User avatar

Joined: Thu Jun 18, 2009 10:04 am
Posts: 1449
Location: Oldham/Manchester
Pebble8 wrote:
Sorry Neil - can you clarify the above, does this mean I can no longer swap to MM? If so, I see this as terrible news. I don't want an apartment in PB......


No you are ok Nicola don't panic I will explain further in the members area.

_________________
Best, Regards, Neil Hollingsworth
Tel:0161 6525563/07717826505
Please have a look at our new website http://www.rivermeadglobalproperty.co.uk


Top
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 30 posts ] 

All times are UTC


Who is online

Users browsing this forum: No registered users and 1 guest


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Jump to:  
cron
Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group